Project Gallery

Soo Foundry Designed and manufactured Stair Case, installed on the exterior of a large hydro electric dam, and covered for year round use.
Printing Press frame and parts destined for Mexico, built to engineered drawings at Soo Foundry’s facility.
32 Ton  transition sleeve manufactured at Soo Foundry’s facility.
Soo Foundry built Controlled Descent Cradle.
Rebuilt drive ready for shipping.
Soo Foundry designed, built and installed Johnson Valve Sleeve at the end of a 300 foot penstock.
Large gear box rebuild.
Soo Foundry installed Intake Gate Staircase.
MPM Stand Rebuild.
Fabricated and installed staircase on face of Hydro Dam.
Vessel Lip Ring