This project consisted of adding PLC I/O drops, changing the existing AC motor/encoders to servo drives, migrating individual controls of each cut-off machine to a single operator pulpit with electrical feeder design and PLC and HMI programming. Guarding was also designed in order to prevent chips from getting lodged in critical areas or building up.