Jaw Crusher Main Frame Refurbishment

Heavy repairs are often needed when disaster strikes. These frames were severely cracked and needed to be repaired within a two-week lead-time. The cracks were repaired as well as other worn and damaged components. The frame was then stress relieved and machined to OEM requirements.