Shekak G.S. Spillway Upgrades
Remote locations and extreme weather for extended periods of time are not a problem for Soo Foundry. At a generating station, 6 hours north of
Remote locations and extreme weather for extended periods of time are not a problem for Soo Foundry. At a generating station, 6 hours north of
Serpent River is a project where we were able to showcase our skills on a complete mechanical refurbishment of two horizontal turbine units. We started
Our 70-ton crane capacity allows us to repair the 50-ton casting in a climate-controlled environment. We can manipulate the casting into a more welding-friendly position
This project started with us following an old design of the oil head components. As the manufacturing progressed, we came to a point where the
SFM recently obtained their 47.2 /59.2 CWB aluminum certification. We have two qualified welding supervisors on staff, as well as three certified welders. We now